Slideshow Elements:
Fire department emergency access illustration, diagram 1
Firelane construction - applied topsoil.
Fire truck access way construction - Ground Graded and Prepped
Fire Engine Emergency Firelane Construction - Ground Preparation Completed
Firelane Installation - Installation of StabiliGrid Grassy Permeable Pavers
Emergency fire engine access construction - 1,076 sqft/man/hour certified rate of application
Firelane accessway installation - trimming in situ with a portable circular saw.
StabiliGrid grassy paver fire department access way - trimming around the automatic sprinkler system.
Pervious Grassed Paver System installation completed - StabiliGrid may be used immediately, even before backfilling.
Fire engine access is immediate, during or after installation.
Dallas fire engine on StabiliGrid grass-paved access way.
Fire engine access area - view from rear of the engine.
Final diagram - Right rear view of Dallas fire engine on StabiliGrid
Other examples:
Composite Permeable Driveway in New Jersey
Grassed, high-vehicular-load emergency firelane construction
Video of Porous Paving Driveway Construction
Grassed Roadway, Grants Pass, Oregon - Horizon Villages
Industrial-commercial parking-storage yard, Low-impact, Low-profile, portable, easily rehabilitated.
Hot Tube Base Installation - EZ and Fast
Stalnecker Driveway and Parking in Pennsylvania
StabiliGrid pervious grass driveway in Portland, Oregon
Invisible grassed road-side verge on a residential driveway.
Grass roadway to shop in Cocoa, Florida